Product Description
We have for sold
USED RAILS R****5
SIZE PER METRIC TON: R**-R*5 Used rail scrap,
HS code ?? *2.*4.*9
? Used Rail (ISRI ****9).
? R**0 (*1.*7 kg/m-GOST*******5)
? R*5 (*4.*2 kg/m ??GOST*******5)
CHEMICAL COMPOSITION :
International Standards as follows: R*0 *1,*7 kg/m GOST ******5 C:
0.**- 0.8%; Mn: 0,*5 - 1.*5 %,Si: 0.*3 - 0.*8 %; P: max. 0.**5 %;S:
max. 0.**5 %; Ar: max. 0.*5 %
R*5 *4.*2 kg/m GOST ******5 C: 0.6 - 0.**2 %; n: 0.*5 - 1.*5 % ;
Si: 0.*3 - 0.*8 %; P: max. 0.**5 %; S: max. 0.**5 %; Ar: max.
0.*5
ISRI-CODES:
(*7)Rail, Steel No. 1.Standard section tee rails, original weight
*0 pounds per yard or heavier,
*0 feet long and over. Suitable for re-rolling into bars and
shapes. Free from bent and twisted
rails, frog, switches, and guard rails, or rails with split heads
and broken flanges. Continuous
welded rail may be included provided no weld is over 9 inches from
the end of the piece of
rail.
(*8A) Rail, Steel No. 2 Cropped Rail Ends. Standard section,
original weight of *0 pounds per
yard and over, *8 inches long and under.
(*8B) Rail, Steel No. 2 Cropped Rail Ends. Standard section,
original weight of *0 pounds per
yard and over, 2 feet long and under.
(*8C) Rail, Steel No. 2 Cropped Rail Ends. Standard section,
original weight *0 pounds per
yard and over, 3 feet long and under.
(*9) Rail, Steel No. 3.Standard section tee, girder, and/or
guardrails, to be free from frog and
switch rails not cut apart and contain no manganese, cast, welds,
or attachments of any kind
except angle bars.
Free from concrete, dirt, and foreign material of any kind.
Origin: South Africa
R**0 (*1.*7 kg/m-GOST*******5)
R*5 (*4.*2 kg/m ??GOST*******5
Payment Terms: LC or SBLC (2% PB)
CIF Price **5$ ASWP
Stock available ****0mt**2months
Country: |
Russia |
Model No: |
-
|
FOB Price: |
240 ~ 260 / Metric Ton ( Negotiable ) (Negotiable)
Get Latest Price
|
Place of Origin: |
South Africa |
Price for Minimum Order: |
240 per Metric Ton |
Minimum Order Quantity: |
30000 Metric Ton |
Packaging Detail: |
Bulk |
Delivery Time: |
30 days after reciving LC or SBLC |
Supplying Ability: |
100000 Metric Ton per Month |
Payment Type: |
L/C |
Product Group : |
- |